First time here? Check out the
Help
page!
Question-and-Answer Resource for the Building Energy Modeling Community
Get started with the Help page
Hi there! Please sign in
help
tags
users
badges
ALL
UNANSWERED
Ask Your Question
RSS
Sort by »
date
activity
answers ▼
votes
144
questions
Tagged
leed
×
126
views
no
answers
2
votes
2019-12-16 09:36:55 -0500
ArturoReyes
Problem running baseline measure in openstudio when cooling tower present for LEED v3 model
appendix-g
cooling-tower
openstudio-measure
openstudio-standards
leed
347
views
no
answers
3
votes
2020-01-22 02:45:30 -0500
kaczjer
Carrier HAP 5.1 compliance with ASHRAE 90.1 VAV inconsistent automation
carrier-hap
ashrae-90.1
leed
207
views
no
answers
2
votes
2020-02-25 14:29:21 -0500
JCR562
Issues with LEED v4 Energy Performance Spreadsheet
leed
155
views
no
answers
3
votes
2020-07-12 12:08:46 -0500
dradair
LEEDv4 CHP Calculation
chp
leed
district-chilled-water
district-heating
308
views
no
answers
1
vote
2020-10-28 09:36:22 -0500
Nathalia
Cooling tower in the simulation of the proposed model for LEED ID + C certification
leed
cooling-tower
332
views
no
answers
1
vote
2021-01-28 06:32:03 -0500
Ag
LEED Summary Equyvalent Full Load Hour
energyplus
leed
appendix-g
summary-report
8k
views
no
answers
2
votes
2021-02-08 03:44:59 -0500
Ery Djunaedy
Heat gains assumption in CIBSE AM10
natural-ventilation
leed
heat-gain
171
views
no
answers
1
vote
2021-02-18 09:08:26 -0500
dradair
LEEDv4 non-predominate system selection residential
leed
appendix-g
residential
135
views
no
answers
1
vote
2021-02-19 20:47:17 -0500
Jacob
High airlfow and fan sizing eQuest, Build 7175
system-sizing
air-flow
leed
equest
appendix-g
155
views
no
answers
2
votes
2021-06-21 21:51:23 -0500
nupoorkansara96@gmail.com
Outside air inputs in designbuilder in both baseline(system 7) and proposed model for 100% outside air system in design
designbuilder
energyplus
outdoor-air
leed
system-7
185
views
no
answers
2
votes
2021-07-28 17:31:48 -0500
crduggin
LEED Commercial Refrigeration Modeling
leed
refrigeration
179
views
no
answers
2
votes
2021-08-20 05:09:15 -0500
Keigo
Any measure to specify System Outdoor Airflow Rate?
energyplus
outdoor-air
ashrae-90.1
ashrae-62.1
leed
77
views
no
answers
2
votes
2022-02-19 16:59:12 -0500
mattkoch
LEED System 4 Fan Selection
openstudio-application
leed
ashrae-90.1
appendix-g
night-cycle
140
views
no
answers
no
votes
2022-12-08 22:59:43 -0500
Velgan
Modeling cold storage for LEED (IARW/IACSC guideline): How to create a one-stage economized system in Energyplus/Open Studios?
refrigeration
equest
leed
75
views
no
answers
no
votes
2023-03-09 09:32:00 -0500
jferamo89
Revolving doors impact in energy model ASHRAE 90.1 [closed]
door
infiltration
vestibule
ashrae-90.1
leed
35
views
no
answers
no
votes
2023-03-22 23:14:13 -0500
Moelsayed
Schedules-Equivalent Full Load Hours output None when loading the LEED Summary and measure
leed
output-report
summary-report
openstudio-application
reporting-measure
40
views
no
answers
1
vote
2023-03-23 06:18:18 -0500
jferamo89
Spa and fitness centre loads
internal-load
service-hot-water
leed
retail
19
views
no
answers
no
votes
2023-05-23 10:43:29 -0500
jferamo89
ASHRAE 55 Analytical comfort zone method calculation
ashrae-55
leed
thermal-comfort
135
views
no
answers
no
votes
2023-08-14 00:23:29 -0500
Eric Dier
Energy Plus(Trace 3D Plus) Ground Source Heat Pump
ground-source-heat-pump
geothermal
gshp
leed
trane-trace
42
views
no
answers
1
vote
2023-09-14 03:08:17 -0500
Eric Dier
eQuest refrigerant Cooling Tower Pump in cold storage
equest
leed
pump
refrigeration
output-report
26
views
no
answers
no
votes
2023-12-24 01:22:21 -0500
LEED_GA
LEED v4.1 - Construction Materials [closed]
construction-set
leed
ashrae-90.1
267
views
no
answers
no
votes
2023-12-24 01:22:23 -0500
LEED_GA
LEED v4.1 - Construction Materials
construction-set
leed
ashrae-90.1
2
views
no
answers
no
votes
2024-04-15 08:22:22 -0500
brunakevellyn
Infrastructure for air conditioning was delivered to the finished building, but the equipment was not [closed]
hvac
leed
baseline
proposed
air-conditioner
4
views
no
answers
no
votes
2024-04-15 09:11:41 -0500
brunakevellyn
infrastructure for air conditioning delivered to the finished building but equipment not
hvac
leed
baseline
proposed
air-conditioner
« previous
1
2
3
4
5
Training Workshops
Careers
Contributors
Tags
leed
×24
ashrae-90.1
×6
appendix-g
×5
energyplus
×3
equest
×3
refrigeration
×3
air-conditioner
×2
baseline
×2
construction-set
×2
cooling-tower
×2
hvac
×2
openstudio-application
×2
outdoor-air
×2
output-report
×2
proposed
×2
summary-report
×2
air-flow
×1
ashrae-55
×1
ashrae-62.1
×1
carrier-hap
×1
chp
×1
designbuilder
×1
district-chilled-water
×1
district-heating
×1
door
×1
geothermal
×1
ground-source-heat-pump
×1
gshp
×1
heat-gain
×1
infiltration
×1
internal-load
×1
natural-ventilation
×1
night-cycle
×1
openstudio-measure
×1
openstudio-standards
×1
pump
×1
reporting-measure
×1
residential
×1
retail
×1
service-hot-water
×1
system-7
×1
system-sizing
×1
thermal-comfort
×1
trane-trace
×1
vestibule
×1
Site design and logo: Copyright © 2015 Big Ladder Software LLC. All rights reserved.
The
Unmet Hours
and
Big Ladder
names and logos are trademarks of Big Ladder Software LLC.
User contributions licensed under the
Creative Commons Attribution Share Alike 3.0 License
.
Powered by
Please note: Unmet Hours requires javascript to work properly, please enable javascript in your browser,
here is how
dummy
×