2018-05-10 03:00:50 -0500
Marco Furlani
Baseline G3.1.2.9: A term (pressure)
appendix-g
fan
leed
369
views
1
answer
3
votes
2018-06-01 10:11:14 -0500
MatthewSteen
Can I find variable pump with performance curve which can be used for LEED baseline case?
openstudio
pump
leed
ashrae-90.1
appendix-g
355
views
1
answer
4
votes
2018-06-12 11:33:40 -0500
willyJohan
Data Center Baseline System Questions
ashrae-90.1
leed
data-center
appendix-g
7k
views
1
answer
2
votes
2019-02-28 23:02:33 -0500
rraustad
What could be the reason why terminal unit reduce cooling even though the zone cannot meet setpoint?
openstudio-standards
openstudio-measure
leed
678
views
1
answer
1
vote
2018-08-23 09:07:29 -0500
crduggin
where to add turn on/off DCV on IES?
ies-ve
dcv
leed
269
views
1
answer
4
votes
2018-09-18 13:50:31 -0500
ericringold
Airport Energy Modeling
airport
ashrae-90.1
leed
440
views
1
answer
1
vote
2018-09-21 13:31:45 -0500
crduggin
IES-ve PRM 90.1-2010 Full Report - Exceptional Calculations
leed
ashrae-90.1
ies-ve
324
views
1
answer
2
votes
2018-10-12 13:31:08 -0500
rraustad
Specifiying cooling coil and baseboard heater capacity
energyplus
coil-capacity
baseboard-heater
leed
644
views
1
answer
1
vote
2018-10-30 21:53:05 -0500
rraustad
Energyplus Custom Meter for HVAC System
energyplus
output-meter
leed
419
views
1
answer
6
votes
2018-12-14 07:11:32 -0500
dradair
LEED Occupancy, design data vs ashrae
leed
appendix-g
1k
views
1
answer
2
votes
2019-08-19 07:44:16 -0500
dradair
System types selected for the Appendix G System 7 baseline model. And if it is right to have assigned a reheat at the system level which makes assigns a reheat for the core zones automatically in the baseline model
appendix-g
leed
equest
235
views
1
answer
3
votes
2019-04-26 15:28:09 -0500
rraustad
Multiplying Capacities? when using Multipliers
openstudio
energyplus
leed
zone-multiplier
522
views
1
answer
8
votes
2023-04-06 04:37:02 -0500
Keigo
ASHRAE/IECC Baseline VAV Fan Curves and Min Flow Fraction
fan
ashrae-90.1
iecc
leed
appendix-g
361
views
1
answer
2
votes
2019-10-01 12:26:18 -0500
emseaman413
System 9 - Excessive unmet hours - eQUEST DOE 2.2
equest
leed
unmet-hours
147
views
1
answer
1
vote
2019-11-14 15:58:57 -0500
EnergyPlus question
Multi-Family Baseline Model
leed
appendix-g
ashrae-90.1
multi-family
130
views
1
answer
2
votes
2020-03-24 07:04:46 -0500
JasonGlazer
LEED ENERGY MODEL, number of chillers
chiller
leed
appendix-g
131
views
1
answer
1
vote
2020-03-21 11:47:20 -0500
crduggin
Number of baseline Chillers - LEED v4
openstudio
appendix-g
chiller
leed
292
views
1
answer
2
votes
2020-05-13 15:26:27 -0500
obuchely
Modelling Natural ventilation for LEED v4
energyplus
leed
natural-ventilation
174
views
1
answer
1
vote
2020-12-30 09:01:08 -0500
mattkoch
How to represent fans for external air intake in openstudio?
openstudio
leed
vrf
outdoor-air
fan
247
views
1
answer
no
votes
2022-03-16 08:47:13 -0500
Aaron Boranian
Hello, I'm studying simulation. I have a question about the error code.
error
leed
trane-trace
application-error
104
views
1
answer
1
vote
2022-05-14 22:40:12 -0500
ShaymaaSK
Can Energyplus be used to conduct energy audits?
leed
energyplus
ashrae-90.1
112
views
1
answer
no
votes
2022-06-23 17:22:04 -0500
obuchely
Design considerations for a multifamily building (LEED Gold)
leed
multi-family
139
views
1
answer
1
vote
2022-10-13 04:47:21 -0500
furtonb
DesignBuilder LEED v4 reporting "Subscript out of range"
designbuilder
leed
104
views
1
answer
1
vote
2023-02-08 20:16:03 -0500
Keigo
Large Single Story Building HVAC Systems
hvac
ashrae-90.1
appendix-g
leed
177
views
1
answer
1
vote
2023-02-24 13:27:40 -0500
Drew Morrison
hourly electric demand (W) from equest?
equest
leed
electrical-consumption
1k
views
2
answers
6
votes
2014-10-15 17:35:51 -0500
Annie Marston
How do I model natural ventilation for LEED in EnergyPlus?
natural-ventilation
energyplus
leed
appendix-g
3k
views
2
answers
10
votes
2014-10-23 09:59:35 -0500
301_Hours
Tolerance for unmet load hours for LEED
leed
unmet-hours
energyplus
equest
appendix-g
1k
views
2
answers
3
votes
2015-10-28 12:12:06 -0500
Gio
Fan power settings of parallel VAV Fan-powered boxes in E+
leed
energyplus
fan
vav
appendix-g
980
views
2
answers
4
votes
2014-11-14 08:54:09 -0500
Julien Marrec
LEED modeling and purchased chilled water / steam
leed
district-chilled-water
district-steam
1k
views
2
answers
2
votes
2014-11-21 10:37:25 -0500
nfonner
How do I determine the sky conditions when using EnergyPlus/ Radiance in OpenStudio
openstudio
radiance
energyplus
daylighting
leed
« previous
1
2
3
4
5
next page »
Training Workshops
Careers
Contributors
Tags
leed
×30
appendix-g
×13
energyplus
×9
ashrae-90.1
×8
openstudio
×5
equest
×4
fan
×4
chiller
×2
ies-ve
×2
multi-family
×2
natural-ventilation
×2
unmet-hours
×2
airport
×1
application-error
×1
baseboard-heater
×1
coil-capacity
×1
data-center
×1
daylighting
×1
dcv
×1
designbuilder
×1
district-chilled-water
×1
district-steam
×1
electrical-consumption
×1
error
×1
hvac
×1
iecc
×1
openstudio-measure
×1
openstudio-standards
×1
outdoor-air
×1
output-meter
×1
pump
×1
radiance
×1
trane-trace
×1
vav
×1
vrf
×1
zone-multiplier
×1
Site design and logo: Copyright © 2015 Big Ladder Software LLC. All rights reserved.
The
Unmet Hours
and
Big Ladder
names and logos are trademarks of Big Ladder Software LLC.
User contributions licensed under the
Creative Commons Attribution Share Alike 3.0 License
.
Powered by
Please note: Unmet Hours requires javascript to work properly, please enable javascript in your browser,
here is how
dummy
×