144
questions
Tagged
leed
×
120
views
1
answer
2
votes
2017-02-14 07:25:15 -0500
Adam Hilton
Baseline system type
leed
appendix-g
parking-garage
1k
views
1
answer
2
votes
2017-03-31 14:52:30 -0500
aparker
Water Heating Equipment Performance Requirements per ASHRAE 90.1-2007
ashrae-90.1
leed
appendix-g
service-hot-water
423
views
no
answers
5
votes
2017-06-16 03:09:50 -0500
Julien Marrec
LEED Volume Certification
leed
equest
energyplus
ies-ve
energypro
295
views
no
answers
3
votes
2017-07-05 10:47:32 -0500
Aaron Boranian
Pumps energy consumptions, Leed proposed vs baseline
designbuilder
variable-speed
pump
leed
525
views
1
answer
5
votes
2017-07-30 03:11:44 -0500
Julien Marrec
LEED Baseline System 8, how many VAV?
leed
appendix-g
hvac
air-loop
vav
147
views
1
answer
6
votes
2017-07-31 08:58:37 -0500
Julien Marrec
Solar collectors, Leed certification
leed
solar-collector
2k
views
1
answer
1
vote
2017-08-01 03:43:50 -0500
Julien Marrec
Baseline Shading System
leed
shading
appendix-g
453
views
1
answer
2
votes
2017-07-31 15:06:54 -0500
ericringold
Air handling unit, Leed certification
leed
air-handling-unit
451
views
2
answers
5
votes
2017-08-01 16:14:28 -0500
Molly Curtz
Baseline System 8, Supply Air temperature
appendix-g
vav
leed
160
views
1
answer
3
votes
2017-08-02 05:43:35 -0500
Julien Marrec
Lighting controls in Leed certification
leed
lighting-control
571
views
1
answer
4
votes
2019-12-06 06:08:41 -0500
kaczjer
Air Curtain Modelling Technique
leed
air-curtain
carrier-hap
infiltration
51k
views
2
answers
5
votes
2017-12-19 11:27:59 -0500
kramerica
What is Proper HVAC Operation Schedule for LEED?
openstudio
ashrae-90.1
leed
schedule
unmet-hours
2k
views
no
answers
4
votes
2017-10-05 02:35:24 -0500
Julien Marrec
HVAC Modelling Open Studio
openstudio
data-center
leed
261
views
1
answer
2
votes
2017-10-19 12:06:50 -0500
ericringold
Realistic new construction Baseline
ashrae-90.1
appendix-g
leed
1k
views
1
answer
2
votes
2017-12-11 21:16:02 -0500
Anna Osborne Brannon
DX Cooling Coil EER and COP
energyplus
openstudio
ashrae-90.1
leed
dx-coil
513
views
1
answer
4
votes
2018-03-16 12:31:08 -0500
dradair
LEED Baseline Building: G3.1.2.9
energyplus
leed
appendix-g
design-air-flow-rate
vav
502
views
1
answer
3
votes
2018-03-20 09:15:08 -0500
dradair
LEED Baseline G3.1.2.1: EER and COP with fan energy
energyplus
performance-data
leed
appendix-g
630
views
1
answer
6
votes
2018-03-22 09:10:00 -0500
dradair
LEED unconditioned zones
appendix-g
leed
energyplus
571
views
2
answers
4
votes
2018-03-23 14:23:16 -0500
rsunnam
Do you actually check this when modelling for LEED? Ashrae 90.1-2007 - G3.1.1 Exception b.
leed
ashrae-90.1
233
views
no
answers
2
votes
2018-04-04 09:06:18 -0500
Gio
Demand control ventilation: LEED
appendix-g
dcv
energyplus
leed
124
views
no
answers
2
votes
2018-04-05 16:17:14 -0500
Gio
LEED Proposed: Mechanical equipment efficiencies
appendix-g
energyplus
leed
190
views
no
answers
3
votes
2018-04-11 13:07:18 -0500
JohannesBk
Air Traffic Control Tower process load
process-load
leed
appendix-g
it-equipment
419
views
no
answers
2
votes
2018-04-11 18:45:30 -0500
Matt Koch
OpenStudio VRF Unmet Hours
openstudio
unmet-hours
vrf
leed
712
views
1
answer
4
votes
2019-03-01 12:10:40 -0500
dhollman
HAP model for VRF with DOAS vs. baseline system 5 (VAV) for LEED v4
carrier-hap
vrf
leed
168
views
1
answer
2
votes
2018-04-24 14:01:57 -0500
rsunnam
Proposed model constructions, leed
ashrae-90.1
leed
energyplus
322
views
1
answer
2
votes
2018-05-10 03:00:50 -0500
Marco Furlani
Baseline G3.1.2.9: A term (pressure)
appendix-g
fan
leed
370
views
1
answer
3
votes
2018-06-01 10:11:14 -0500
MatthewSteen
Can I find variable pump with performance curve which can be used for LEED baseline case?
openstudio
pump
leed
ashrae-90.1
appendix-g
356
views
1
answer
4
votes
2018-06-12 11:33:40 -0500
willyJohan
Data Center Baseline System Questions
ashrae-90.1
leed
data-center
appendix-g
7k
views
1
answer
2
votes
2019-02-28 23:02:33 -0500
rraustad
What could be the reason why terminal unit reduce cooling even though the zone cannot meet setpoint?
openstudio-standards
openstudio-measure
leed
684
views
1
answer
1
vote
2018-08-23 09:07:29 -0500
crduggin
where to add turn on/off DCV on IES?
ies-ve
dcv
leed
« previous
1
2
3
4
5
next page »
Training Workshops
Careers
Contributors
Tags
leed
×30
appendix-g
×15
ashrae-90.1
×8
energyplus
×8
openstudio
×5
vav
×3
carrier-hap
×2
data-center
×2
dcv
×2
ies-ve
×2
pump
×2
unmet-hours
×2
vrf
×2
air-curtain
×1
air-handling-unit
×1
air-loop
×1
design-air-flow-rate
×1
designbuilder
×1
dx-coil
×1
energypro
×1
equest
×1
fan
×1
hvac
×1
infiltration
×1
it-equipment
×1
lighting-control
×1
openstudio-measure
×1
openstudio-standards
×1
parking-garage
×1
performance-data
×1
process-load
×1
schedule
×1
service-hot-water
×1
shading
×1
solar-collector
×1
variable-speed
×1
Site design and logo: Copyright © 2015 Big Ladder Software LLC. All rights reserved.
The
Unmet Hours
and
Big Ladder
names and logos are trademarks of Big Ladder Software LLC.
User contributions licensed under the
Creative Commons Attribution Share Alike 3.0 License
.
Powered by
Please note: Unmet Hours requires javascript to work properly, please enable javascript in your browser,
here is how
dummy
×