First time here? Check out the
Help
page!
Question-and-Answer Resource for the Building Energy Modeling Community
Get started with the Help page
Hi there! Please sign in
help
tags
users
badges
ALL
UNANSWERED
Ask Your Question
RSS
Sort by »
date ▼
activity
answers
votes
135
questions
Tagged
appendix-g
×
235
views
1
answer
2
votes
2017-02-22 12:35:19 -0500
Julien Marrec
Openstudio Baseline Building measure Error.
error
openstudio-measure
ashrae-90.1
openstudio-standards
appendix-g
120
views
1
answer
2
votes
2017-02-14 07:25:15 -0500
Adam Hilton
Baseline system type
leed
appendix-g
parking-garage
175
views
1
answer
4
votes
2017-03-23 11:25:01 -0500
rsunnam
Electrical distribution efficiency
ashrae-90.1
appendix-g
electric-equipment
180
views
no
answers
1
vote
2017-01-06 16:47:53 -0500
Tristan
AppG Baseline for Patient Rooms
ashrae-90.1
appendix-g
ptac
732
views
1
answer
8
votes
2016-12-20 12:07:10 -0500
ericringold
why is 90.1 Appendix G Baseline one system per floor
ashrae-90.1
appendix-g
hvac
493
views
2
answers
6
votes
2016-11-09 14:23:29 -0500
JasonGlazer
on-site renewables in Appendix G
ashrae-90.1
appendix-g
385
views
2
answers
1
vote
2016-10-02 00:12:31 -0500
Anna
LEED Appendix G - System 7 or System 8?
leed
appendix-g
109
views
1
answer
1
vote
2016-09-22 16:10:40 -0500
Annie Marston
LEED CI EAc1.3 - ECB vs Appendix G
leed
appendix-g
ecb
300
views
1
answer
1
vote
2016-09-15 09:02:13 -0500
Annie Marston
Baseline AHU system level sizing - LAT
ashrae-90.1
appendix-g
system-sizing
918
views
1
answer
4
votes
2016-08-31 10:51:10 -0500
Annie Marston
Modelling fenestration to Appendix G - LEED
openstudio
appendix-g
leed
fenestration
ashrae-90.1
189
views
1
answer
2
votes
2016-08-03 15:41:17 -0500
TaylorRoberts
ASHRAE 90.1-2007 App G PRM G3.1.2.4
night-cycle
ashrae-90.1
appendix-g
1k
views
1
answer
3
votes
2021-01-29 12:56:21 -0500
crduggin
What should the fuel source for the ASHRAE Baseline Model be when the proposed has a VRF System?
vrf
ashrae-90.1
appendix-g
leed
415
views
no
answers
5
votes
2016-04-27 17:38:07 -0500
Amir Rezaei
ASHRAE Baseline system 3 - High Fan Energy
appendix-g
ashrae-90.1
215
views
1
answer
2
votes
2016-04-06 16:06:20 -0500
TaylorRoberts
ASHRAE Baseline System 2, how to control electric energized auxiliary heat below 40F??
openstudio
hvac-control
ashrae-90.1
appendix-g
253
views
1
answer
2
votes
2016-02-17 07:40:13 -0500
__AmirRoth__
Radiant Heating - Baseline?
radiant-cooling
radiant-heating
ashrae-90.1
cbecc-com
appendix-g
128
views
1
answer
2
votes
2016-01-28 08:29:11 -0500
rraustad
Modeling an incomplete heating system
appendix-g
heating-system
364
views
1
answer
3
votes
2015-12-01 19:19:20 -0500
aparker
How to modifying design day conditions as per ASHRAE 90.1 G1.2.2.1?
ashrae-90.1
appendix-g
ddy-file
design-day
openstudio
1k
views
2
answers
10
votes
2016-07-20 03:47:31 -0500
Julien Marrec
Appendix G condenser water temperature reset in EnergyPlus
energyplus
condenser-loop
appendix-g
ashrae-90.1
475
views
1
answer
1
vote
2015-11-02 19:17:42 -0500
new2modeling
I have multiple buildings in a single model for a LEED Group certification. How is the baseline system type determined?
equest
appendix-g
leed
hvac
269
views
1
answer
2
votes
2015-10-29 12:50:56 -0500
Daniel
I've modeled my baseline with the appropriate oversizing ratios for heating and cooling (1.25 and 1.15, respectively). Do I keep this oversizing in my proposed model?
equest
system-sizing
appendix-g
1k
views
4
answers
10
votes
2016-12-15 07:13:51 -0500
yongqingzhao
Reducing WWR to 40%: which approach?
window-wall-ratio
ashrae-90.1
appendix-g
627
views
2
answers
6
votes
2015-07-14 13:48:21 -0500
JasonGlazer
SYSTEM and EQUIPAMENT CAPACITY for LEED
energyplus
openstudio
leed
appendix-g
258
views
1
answer
4
votes
2015-07-10 06:11:46 -0500
JasonGlazer
Is it necessary to insert the energy cost to LEED simulations ?
energy-cost
leed
openstudio
ashrae-90.1
appendix-g
1k
views
3
answers
4
votes
2015-06-19 10:27:16 -0500
nfonner
Modeling Fans for LEED
openstudio
fan
leed
appendix-g
887
views
1
answer
10
votes
2015-06-04 10:20:58 -0500
Annie Marston
Is it possible to submeter a single building of a multiple building model?
openstudio
energyplus
output-meter
leed
appendix-g
1k
views
3
answers
3
votes
2015-04-28 14:05:27 -0500
Julien Marrec
Wall boundary condition when abutting an adjacent building
appendix-g
boundary-condition
code-compliance
wall
leed
912
views
2
answers
3
votes
2015-09-02 18:13:13 -0500
MatthewSteen
Set Window to Wall Ratio in Sketchup fails
window-wall-ratio
appendix-g
sketchup
openstudio-measure
geometry
613
views
1
answer
4
votes
2015-03-24 23:33:27 -0500
macumber
Shading by adjacent structures not possible in LEED baseline and E+
energyplus
leed
shading
appendix-g
804
views
1
answer
6
votes
2015-03-18 13:28:19 -0500
wangh
Using OpenStudio for LEED certification
openstudio
energyplus
leed
appendix-g
665
views
4
answers
6
votes
2015-02-24 09:40:47 -0500
MatthewSteen
From Baseline to Proposed model, or from Proposed to Baseline?
code-compliance
appendix-g
ashrae-90.1
« previous
1
2
3
4
5
next page »
Training Workshops
Careers
Contributors
Tags
appendix-g
×30
ashrae-90.1
×17
leed
×13
openstudio
×8
energyplus
×5
code-compliance
×2
equest
×2
hvac
×2
openstudio-measure
×2
system-sizing
×2
window-wall-ratio
×2
boundary-condition
×1
cbecc-com
×1
condenser-loop
×1
ddy-file
×1
design-day
×1
ecb
×1
electric-equipment
×1
energy-cost
×1
error
×1
fan
×1
fenestration
×1
geometry
×1
heating-system
×1
hvac-control
×1
night-cycle
×1
openstudio-standards
×1
output-meter
×1
parking-garage
×1
ptac
×1
radiant-cooling
×1
radiant-heating
×1
shading
×1
sketchup
×1
vrf
×1
wall
×1
Site design and logo: Copyright © 2015 Big Ladder Software LLC. All rights reserved.
The
Unmet Hours
and
Big Ladder
names and logos are trademarks of Big Ladder Software LLC.
User contributions licensed under the
Creative Commons Attribution Share Alike 3.0 License
.
Powered by
Please note: Unmet Hours requires javascript to work properly, please enable javascript in your browser,
here is how
dummy
×