2015-07-10 09:27:20 -0500 | answered a question | Water Service Modeling Help Hello, First of all, thank you so much for the quick answer. I just have to make the same question, because I have made a mistake in the drawing. The water that leaves the Water Tank Storage (WTS), that is not used in shower does not return to the WTS, but actually pre-heat the fresh water that enter in the 3-way valve. Do I have to change drastically the solution that was provide? Thanks, |
2015-07-07 14:27:45 -0500 | received badge | ● Student (source) |
2015-07-07 07:59:34 -0500 | asked a question | Water Service Modeling Help Hello, (sorry in advance for the English) So I have the following scheme, 1) Boiler----Pump1-----Plate Heat Exchanger----Boiler 2) Plate Heat Exchanger-------Pump2------Water Tank--------Plate Heat Exchanger 3) Water Tank------3 way Valve-----Showers------Pump3------Water Tank I am new in the modeling, can anyone please guide me. Do I have to create 3 water plant loop, and go from there? I´m using Openstudio 1.7.5 and Energyplus 8.3 Thanks for the help Hello, First of all, thank you so much for the quick answer. I just have to make the same question, because I have made a mistake in the drawing. The water that leaves the Water Tank Storage (WTS), that is not used in shower does not return to the WTS, but actually pre-heat the fresh water that enter in the 3-way valve. image description Do I have to change drastically the solution that was provide? Thanks, |