2017-08-01 08:55:22 -0500 | marked best answer | Air handling unit, Leed certification Good afternoon, I am modeling the baseline building hvac system for a Leed certification. There is a hvac system No.8 which serves two different zones on the same plane (a single system is required), providing primary air and cooling the environments. In the proposed building, an area has a fancoil while the other is directly connected to the AHU. Moving to the baseline, if both zones require cooling but only one requires air exchange, the second zone will receive an unnecessary air replacement, contradicting G3.1.2.5. How can I fix the problem? Do I have to create more AHU? |
2017-08-01 08:55:17 -0500 | commented answer | Air handling unit, Leed certification Thank you @Eric. |
2017-08-01 03:43:32 -0500 | commented answer | Air handling unit, Leed certification I confirm that this was the standard 90.1-207. If I understood correctly, do you mean that in the baseline building I ha |
2017-07-31 11:41:16 -0500 | commented question | Air handling unit, Leed certification @David Goldwasser Thank you, but I still don't understand. Immagine: two zones in the same floor. Both demand cooling bu |
2017-07-31 10:51:59 -0500 | asked a question | Air handling unit, Leed certification Air handling unit, Leed certification Good afternoon, I am modeling the baseline building hvac system for a Leed certif |
2017-07-31 10:15:54 -0500 | marked best answer | Solar collectors, Leed certification I must perform a leed certification for a proposed building in which there is a hot water circuit connected to a solar collector. How do I have to model it in the baseline building? I have seen that in Table 7.8 there are some indications for electric water heaters but I find nothing about solar collectors. |
2017-07-31 10:15:54 -0500 | received badge | ● Scholar (source) |
2017-07-31 10:15:52 -0500 | commented answer | Solar collectors, Leed certification Everything is clear. Thank you for the answer and the link to the other question, they were both useful. |
2017-07-31 10:14:47 -0500 | answered a question | Solar collectors, Leed certification Everything is clear. Thank you for the answer and the link to the other question, they were both useful. |
2017-07-31 07:24:44 -0500 | commented question | Solar collectors, Leed certification The solar collectors serve the DHW circuit; there is an integrated electric resistance because the solar power is insuff |
2017-07-31 06:16:19 -0500 | asked a question | Solar collectors, Leed certification Solar collectors, Leed certification Good morning, I must perform a leed certification for a proposed building in which |
2017-07-28 05:03:49 -0500 | received badge | ● Supporter (source) |
2017-07-05 10:56:28 -0500 | received badge | ● Student (source) |
2017-07-05 10:46:17 -0500 | asked a question | Pumps energy consumptions, Leed proposed vs baseline Pumps energy consumptions, Leed proposed vs baseline Hi everybody, I'm working on a model in DesignBuilder. In the plan |