2017-08-01 08:55:22 -0500 marked best answer Air handling unit, Leed certification

Good afternoon,

I am modeling the baseline building hvac system for a Leed certification. There is a hvac system No.8 which serves two different zones on the same plane (a single system is required), providing primary air and cooling the environments. In the proposed building, an area has a fancoil while the other is directly connected to the AHU. Moving to the baseline, if both zones require cooling but only one requires air exchange, the second zone will receive an unnecessary air replacement, contradicting G3.1.2.5.

How can I fix the problem? Do I have to create more AHU?

2017-08-01 08:55:17 -0500 commented answer Air handling unit, Leed certification

Thank you @Eric.

2017-08-01 03:43:32 -0500 commented answer Air handling unit, Leed certification

I confirm that this was the standard 90.1-207. If I understood correctly, do you mean that in the baseline building I ha

2017-07-31 11:41:16 -0500 commented question Air handling unit, Leed certification

@David Goldwasser Thank you, but I still don't understand. Immagine: two zones in the same floor. Both demand cooling bu

2017-07-31 10:51:59 -0500 asked a question Air handling unit, Leed certification

Air handling unit, Leed certification Good afternoon, I am modeling the baseline building hvac system for a Leed certif

2017-07-31 10:15:54 -0500 marked best answer Solar collectors, Leed certification

I must perform a leed certification for a proposed building in which there is a hot water circuit connected to a solar collector. How do I have to model it in the baseline building? I have seen that in Table 7.8 there are some indications for electric water heaters but I find nothing about solar collectors.

2017-07-31 10:15:54 -0500 received badge  Scholar (source)
2017-07-31 10:15:52 -0500 commented answer Solar collectors, Leed certification

Everything is clear. Thank you for the answer and the link to the other question, they were both useful.

2017-07-31 10:14:47 -0500 answered a question Solar collectors, Leed certification

Everything is clear. Thank you for the answer and the link to the other question, they were both useful.

2017-07-31 07:24:44 -0500 commented question Solar collectors, Leed certification

The solar collectors serve the DHW circuit; there is an integrated electric resistance because the solar power is insuff

2017-07-31 06:16:19 -0500 asked a question Solar collectors, Leed certification

Solar collectors, Leed certification Good morning, I must perform a leed certification for a proposed building in which

2017-07-28 05:03:49 -0500 received badge  Supporter (source)
2017-07-05 10:56:28 -0500 received badge  Student (source)
2017-07-05 10:46:17 -0500 asked a question Pumps energy consumptions, Leed proposed vs baseline

Pumps energy consumptions, Leed proposed vs baseline Hi everybody, I'm working on a model in DesignBuilder. In the plan