Hello everyone, I am trying to find out if there are pre-built Domestic Hot Water schedules in OpenStudio. I can't find any schedules in the included libraries. I can see I need to first create a load in the Loads section (or in the HVAC System tab) but then I do not know where the actual fraction schedule is. Or even if there is one. To create one on my own seems quite arbitrary. And although I might be able to guess some things (hand washing before/after lunch)
So I suppose the question is whether are pre-built fractional schedules in OpenStudio or where I would be able to find them.
I realise it is quite a silly question, but I have been going through the included libraries and I couldn't find any. Thank you very much for your help! I wish you all a great day!
Regards, Luca Casamassima.