What is the difference between Apply Measure Now and Drop Measure from Library to create a New Always Run Measure

I try to applied Add Rooftop PV measure with the two differents ways.

With Apply measure now, a new shading element (included in the measure) is visible in Facility - Shading and also in the geomtery. Openstudio results shows PV production.

By dropping the measure from the library to Open Studio Measure, the shading element is not visible in the geometry even after running the simulation. Openstudio results shows PV production.

Why these differences ? To better understand how measure work, what are the differences between these to ways of applying a Measure ?

What is the difference between Apply Measure Now and Drop Measure from Library to create a New Always Run Measure

I try to applied Add Rooftop PV measure with the two differents ways.

With Apply measure now, a new shading element (included in the measure) is visible in Facility - Shading and also in the geomtery. Openstudio results shows PV production.

By dropping the measure from the library to Open Studio Measure, the shading element is not visible in the geometry even after running the simulation. Openstudio results shows PV production.

Why these differences ? To better understand how measure work, what are the differences between these to ways of applying a Measure ?

What is the difference between Apply Measure Now and Drop Measure from Library to create a New Always Run Measure

I try to applied Add Rooftop PV measure with the two differents ways.

With Apply measure now, a new shading element (included in the measure) is visible in Facility - Shading and also in the geomtery. Openstudio results shows PV production.

By dropping the measure from the library to Open Studio Measure, the shading element is not visible in the geometry even after running the simulation. Openstudio results shows PV production.

Why these differences ? To better understand how measure work, what are the differences between these to ways of applying a Measure ?