Hi,
I'm having a lot of trouble changing out the HVAC system in this model. I am trying the replace the HVAC with a Appendix G baseline system.
-When I use a measure like Remove All Equipment (in the attached project folder), it runs and appears to work, but every time I go back to the Thermal Zone Tab it crashes -When I try running a measure to add a new HVAC System on top of the old one (like the PSZ 4 in the attached project folder), it works but it leaves lots of old Zone equipment in place. When I start deleting zone equipment eventually one item crashes the model when I try to delete it. The offending item seems to be random.
Is there a better way to do this? I tried making a new OS model and importing data from the old OSM but that blows away both HVAC and schedules, constructions, etc.