Hi team,
Good day.
In the "weather file and design days" tab, I have selected some design days for my site location in which 4 files are placed as "summer design day" in the day type and 3 files are placed as "winter design day".
In the schedules tab, I have defined the following schedule having a run profile with default, priority 1, and priority 2.
For the same schedule, I have the built in summer and winter design days profiles as below:
I have done my HVAC system and I am using auto-sizing for some equipment.
For my case with the imported design days I have, I don't understand, is open-studio using for the HVAC my schedule or the summer/winter design day one ? This really makes a difference with several schedules defined. If it is using the summer/winter design day, how can I modify it to be like what I want ? I am not able to do that.
Thanks team !!
Stay safe, With my best regards,