I have a Baseline model with a server room. I was wondering what the prescribed system would be following ASHRAE Appendix G?
A PTAC seems like the most straightforward answer but is there a baseline system type I should use for this space?
Currently the space is keeping a constantly load on the central chiller, producing 4000+ hour a year below a 10 percent part load, which is obviously unrealistic.