Hello,
I am modeling a simple green roof model for my gemoetry. This is the procedures that I have done but I did not get a result yet. First, I did all the simulation in Openstudio. Then, I export IDF file and open it with EnergyPlus. In Energyplus I defined roofirrigation based on a schedule. Then, I save it and open o new openstudio and import the new IDF file in openstudio. But at this time, I faced with this error "file is not valid to draft strictness" . I do not know what to do now. Did anyone do irrigation with Energyplus before? I would be grateful if you can help me to run a green roof with irrigation schedule.
Thank you so much.