cooling setpoint scehdules

Hi, I need to have different cooling setpoint schedules for different zones. However i am facing some troubles doing that: 1) as i cannot copy the existing cooling point schedules and edit them later I am creating new schedules. These new schedules are throwing errors as I cannot set control type values. I am getting error of "invalid controller". How to go about it.

2) In the tab thermal zones I am trying to change schedules for selected thermal zones. but as and when i drag and drop a different schedule the schedules of all the other zones changes automatically. Please guide me on how to set different schedules for different thermal zones.

Best, Sanket

cooling Cooling setpoint scehdulesschedules

Hi, I need to have different cooling setpoint schedules for different zones. However i I am facing some troubles doing that: 1) as i that:

  1. As I cannot copy the existing cooling point schedules and edit them later I am creating new schedules. These new schedules are throwing errors as I cannot set control type values. I am getting error of "invalid controller". How to go about it.

  2. 2)

  3. In the tab thermal zones zones, I am trying to change the schedules for the selected thermal zones. but as and But when i I drag and drop a different schedule schedule, the schedules of all the other zones changes automatically. Please guide me on how to set different schedules for different thermal zones.

Best, Sanket

Cooling setpoint schedules

Hi, I need to have different cooling setpoint schedules for different zones. However I am facing some troubles doing that:

  1. As I cannot copy the existing cooling point schedules and edit them later I am creating new schedules. These new schedules are throwing errors as I cannot set control type values. I am getting error of "invalid controller". How to go about it.
  2. In the tab thermal zones, I am trying to change the schedules for the selected thermal zones. But when I drag and drop a different schedule, the schedules of all the other zones changes automatically. Please guide me on how to set different schedules for different thermal zones.

Best, Sanket