Hi,
In the loads tab I set the maximum design level for the electric equipment load:
In space tab/loads I set the schedule for the electric equipment load as "IT Room Equip"
In schedules tab/schedules I set hourly fractional run period profiles according to the variations of electric equipment load for specific days of the year
In schedules tab/schedules sets I set Electric Equipment as "IT Room Equip"
In ResultsViewer I see no variation of Zone Electric Equipment Electric Power.
Why is this happening? (why not taking account the power variations of electric equipment)