Run period profiles

Hi,

In the loads tab I set the maximum design level for the electric equipment load: image description

In space tab/loads I set the schedule for the electric equipment load as "IT Room Equip" image description

In schedules tab/schedules I set hourly fractional run period profiles according to the variations of electric equipment load for specific days of the year image description

In schedules tab/schedules sets I set Electric Equipment as "IT Room Equip" image description

In ResultsViewer I see no variation of Zone Electric Equipment Electric Power. image description

Why is this happening? (why not taking account the power variations of electric equipment)

Run period profiles

Hi,

In the loads tab I set the maximum design level for the electric equipment load: image description

In space tab/loads I set the schedule for the electric equipment load as "IT Room Equip" image description

In schedules tab/schedules I set hourly fractional run period profiles according to the variations of electric equipment load for specific days of the year image description

In schedules tab/schedules sets I set Electric Equipment as "IT Room Equip" image description

In ResultsViewer I see no variation of Zone Electric Equipment Electric Power. image description

Why is this happening? (why not taking account the power variations of electric equipment)

Run period profiles

Hi,Hi, I 'm using openstudio 1.8

In the loads tab I set the maximum design level for the electric equipment load: image description

In space tab/loads I set the schedule for the electric equipment load as "IT Room Equip" image description

In schedules tab/schedules I set hourly fractional run period profiles according to the variations of electric equipment load for specific days of the year image description

In schedules tab/schedules sets I set Electric Equipment as "IT Room Equip" image description

In ResultsViewer I see no variation of Zone Electric Equipment Electric Power. image description

Why is this happening? (why not taking account the power variations of electric equipment)

Run period profiles

Hi, I 'm using openstudio 1.8

In the loads tab I set the maximum design level for the electric equipment load: image description

In space tab/loads I set the schedule for the electric equipment load as "IT Room Equip" image description

In schedules tab/schedules I set hourly fractional run period profiles according to the variations of electric equipment load for specific days of the year image description

In schedules tab/schedules sets I set Electric Equipment as "IT Room Equip" image description

In ResultsViewer I see no variation of Zone Electric Equipment Electric Power. image description

Why is this happening? (why not taking account the power variations of electric equipment)

Edited---------------------

The Facility Tab, sorting by space type and Thermal zone

image description image description image description image description

Run period profiles

Hi, I 'm using openstudio 1.8

In the loads tab I set the maximum design level for the electric equipment load: image description

In space tab/loads I set the schedule for the electric equipment load as "IT Room Equip" image description

In schedules tab/schedules I set hourly fractional run period profiles according to the variations of electric equipment load for specific days of the year image description

In schedules tab/schedules sets I set Electric Equipment as "IT Room Equip" image description

In ResultsViewer I see no variation of Zone Electric Equipment Electric Power. image description

It seems like the default run period overrides all others. Why is this happening? (why not taking account the power variations of electric equipment)

Edited---------------------

The Facility Tab, sorting by space type and Thermal zone

image description image description image description image description

Run period profiles

Hi, I 'm using openstudio 1.8

In the loads tab I set the maximum design level for the electric equipment load: image description

In space tab/loads I set the schedule for the electric equipment load as "IT Room Equip" image description

In schedules tab/schedules I set hourly fractional run period profiles according to the variations of electric equipment load for specific days of the year image description

In schedules tab/schedules sets I set Electric Equipment as "IT Room Equip" image description

In ResultsViewer I see no variation of Zone Electric Equipment Electric Power. image description

It seems like the default run period overrides all others. Why is this happening? (why not taking account the power variations of electric equipment)

Edited---------------------

The Facility Tab, sorting by space type and Thermal zone

image description image description image description image description

Edit ---------------------------------------------------------------

The Default profile works fine! The question is why overrides priority profiles

image description

Results

image description

Run period profiles

Hi, I 'm using openstudio 1.8

In the loads tab I set the maximum design level for the electric equipment load: image description

In space tab/loads I set the schedule for the electric equipment load as "IT Room Equip" image description

In schedules tab/schedules I set hourly fractional run period profiles according to the variations of electric equipment load for specific days of the year image description

In schedules tab/schedules sets I set Electric Equipment as "IT Room Equip" image description

In ResultsViewer I see no variation of Zone Electric Equipment Electric Power. image description

It seems like the default run period overrides all others. Why is this happening? (why not taking account the power variations of electric equipment)

Edited---------------------

The Facility Tab, sorting by space type and Thermal zone

image description image description image description image description

Edit ---------------------------------------------------------------

The Default profile works fine! The question is why overrides priority profiles

image description

Results

image description

Run period profiles

Hi, I 'm using openstudio 1.8

In the loads tab I set the maximum design level for the electric equipment load: image description

In space tab/loads I set the schedule for the electric equipment load as "IT Room Equip" image description

In schedules tab/schedules I set hourly fractional run period profiles according to the variations of electric equipment load for specific days of the year image description

In schedules tab/schedules sets I set Electric Equipment as "IT Room Equip" image description

In ResultsViewer I see no variation of Zone Electric Equipment Electric Power. image description

It seems like the default run period overrides all others. Why is this happening? (why not taking account the power variations of electric equipment)

Edited---------------------

The Facility Tab, sorting by space type and Thermal zone

image description image description image description image description

Edit ---------------------------------------------------------------

The Default profile works fine! The question is why overrides priority profiles

image description

Results

image description

EDIT--------------------------------------------------------------