From Baseline to Proposed model, or from Proposed to Baseline?
I'm curious as to the pros and cons of building either the Baseline first of the Proposed Model first, when using ASHRAE 90.1 Appendix G for New Construction projects.
What makes more sense? Why?
I'll accept both software-agnostic and software-specific reasons.