initial version

Since the IDF file you are referring to doesn't have a RunPeriod object, EnergyPlus runs the simulation for only the two design days as specified by default in the SimulationControl object. You should add the RunPeriod object and select the desired simulation period. If the IDF has no specific objects, like RunPeriod or SimulationControl, you can actually add them yourself and modify the parameters as desired.

If you are using EP-Launch, you can search for the object you want from the Class List and click on New Obj, you will be able to add/modify the fields.