Revision history [back]

Your result of 2100 kW is during the design day. Normally, weather and schedules are different than the conditions during your yearly EPW RunPeriod. While such a drastic difference should not be expected, I would check the difference in schedules for your internal gains for the design day and the run period. Normally internal gains are scheduled to be 100% during the design day, but less than 100% during normal operation.