I would look at two points to start with:
- Make sure that infiltration in your model is set according to the situation in your actual building. That might increase demand profoundly depending on your building insulation level.
- If the building is low rise then your ground model have to be tweaked to represent realistic ground temperatures. You can read that post for more details.