First time here? Check out the Help page!
1 | initial version |
File menu --> Export file--> Space Loads Report (CSV)
This will report space areas, Lighting Power, and Misc. Equip. Power for all spaces in the model. You can open the CSV file in a spreadsheet and sum the values.
I'm not sure if Misc. Equipment is the extent of what you mean by "installed electrical equipment".
2 | No.2 Revision |
File menu --> Export file--> Space Loads Report (CSV)
This will report space areas, Lighting Power, and Misc. Equip. Power for all spaces in the model. You can open the CSV file in a spreadsheet and sum the values.
The LPD, EPD and Area are also reported in the SIM output file in the LV-B report. You can copy that into a spreasheet and calculate the total values.
I'm not sure if Misc. Equipment is the extent of what you mean by "installed electrical equipment".