First time here? Check out the
Help
page!
Question-and-Answer Resource for the Building Energy Modeling Community
Get started with the Help page
Hi there! Please sign in
help
tags
users
badges
ALL
UNANSWERED
Ask Your Question
RSS
Sort by »
date
activity ▼
answers
votes
144
questions
Tagged
leed
×
676
views
1
answer
1
vote
2018-08-23 09:07:29 -0500
crduggin
where to add turn on/off DCV on IES?
ies-ve
dcv
leed
354
views
1
answer
4
votes
2018-06-12 11:33:40 -0500
willyJohan
Data Center Baseline System Questions
ashrae-90.1
leed
data-center
appendix-g
369
views
1
answer
3
votes
2018-06-01 10:11:14 -0500
MatthewSteen
Can I find variable pump with performance curve which can be used for LEED baseline case?
openstudio
pump
leed
ashrae-90.1
appendix-g
319
views
1
answer
2
votes
2018-05-10 03:00:50 -0500
Marco Furlani
Baseline G3.1.2.9: A term (pressure)
appendix-g
fan
leed
167
views
1
answer
2
votes
2018-04-24 14:01:57 -0500
rsunnam
Proposed model constructions, leed
ashrae-90.1
leed
energyplus
419
views
no
answers
2
votes
2018-04-11 18:45:30 -0500
Matt Koch
OpenStudio VRF Unmet Hours
openstudio
unmet-hours
vrf
leed
190
views
no
answers
3
votes
2018-04-11 13:07:18 -0500
JohannesBk
Air Traffic Control Tower process load
process-load
leed
appendix-g
it-equipment
124
views
no
answers
2
votes
2018-04-05 16:17:14 -0500
Gio
LEED Proposed: Mechanical equipment efficiencies
appendix-g
energyplus
leed
231
views
no
answers
2
votes
2018-04-04 09:06:18 -0500
Gio
Demand control ventilation: LEED
appendix-g
dcv
energyplus
leed
569
views
2
answers
4
votes
2018-03-23 14:23:16 -0500
rsunnam
Do you actually check this when modelling for LEED? Ashrae 90.1-2007 - G3.1.1 Exception b.
leed
ashrae-90.1
629
views
1
answer
6
votes
2018-03-22 09:10:00 -0500
dradair
LEED unconditioned zones
appendix-g
leed
energyplus
500
views
1
answer
3
votes
2018-03-20 09:15:08 -0500
dradair
LEED Baseline G3.1.2.1: EER and COP with fan energy
energyplus
performance-data
leed
appendix-g
512
views
1
answer
4
votes
2018-03-16 12:31:08 -0500
dradair
LEED Baseline Building: G3.1.2.9
energyplus
leed
appendix-g
design-air-flow-rate
vav
51k
views
2
answers
5
votes
2017-12-19 11:27:59 -0500
kramerica
What is Proper HVAC Operation Schedule for LEED?
openstudio
ashrae-90.1
leed
schedule
unmet-hours
1k
views
1
answer
2
votes
2017-12-11 21:16:02 -0500
Anna Osborne Brannon
DX Cooling Coil EER and COP
energyplus
openstudio
ashrae-90.1
leed
dx-coil
261
views
1
answer
2
votes
2017-10-19 12:06:50 -0500
ericringold
Realistic new construction Baseline
ashrae-90.1
appendix-g
leed
2k
views
no
answers
4
votes
2017-10-05 02:35:24 -0500
Julien Marrec
HVAC Modelling Open Studio
openstudio
data-center
leed
160
views
1
answer
3
votes
2017-08-02 05:43:35 -0500
Julien Marrec
Lighting controls in Leed certification
leed
lighting-control
447
views
2
answers
5
votes
2017-08-01 16:14:28 -0500
Molly Curtz
Baseline System 8, Supply Air temperature
appendix-g
vav
leed
2k
views
1
answer
1
vote
2017-08-01 03:43:50 -0500
Julien Marrec
Baseline Shading System
leed
shading
appendix-g
452
views
1
answer
2
votes
2017-07-31 15:06:54 -0500
ericringold
Air handling unit, Leed certification
leed
air-handling-unit
146
views
1
answer
6
votes
2017-07-31 08:58:37 -0500
Julien Marrec
Solar collectors, Leed certification
leed
solar-collector
524
views
1
answer
5
votes
2017-07-30 03:11:44 -0500
Julien Marrec
LEED Baseline System 8, how many VAV?
leed
appendix-g
hvac
air-loop
vav
292
views
no
answers
3
votes
2017-07-05 10:47:32 -0500
Aaron Boranian
Pumps energy consumptions, Leed proposed vs baseline
designbuilder
variable-speed
pump
leed
423
views
no
answers
5
votes
2017-06-16 03:09:50 -0500
Julien Marrec
LEED Volume Certification
leed
equest
energyplus
ies-ve
energypro
3k
views
5
answers
7
votes
2017-04-07 14:56:24 -0500
CR Jones
regenerative elevators
elevator
leed
appendix-g
ashrae-90.1
1k
views
1
answer
2
votes
2017-03-31 14:52:30 -0500
aparker
Water Heating Equipment Performance Requirements per ASHRAE 90.1-2007
ashrae-90.1
leed
appendix-g
service-hot-water
120
views
1
answer
2
votes
2017-02-14 07:25:15 -0500
Adam Hilton
Baseline system type
leed
appendix-g
parking-garage
205
views
1
answer
2
votes
2017-02-09 08:52:18 -0500
anchapin
LEED Commercial Interior CI v2009 EAc1.3
leed
524
views
1
answer
1
vote
2017-01-27 01:16:19 -0500
Dave
ashrae 90.1 requirements for industrial process energy?
ashrae-90.1
process-load
leed
designbuilder
« previous
1
2
3
4
5
next page »
Training Workshops
Careers
Contributors
Tags
leed
×30
appendix-g
×16
ashrae-90.1
×10
energyplus
×8
openstudio
×5
vav
×3
data-center
×2
dcv
×2
designbuilder
×2
ies-ve
×2
process-load
×2
pump
×2
unmet-hours
×2
air-handling-unit
×1
air-loop
×1
design-air-flow-rate
×1
dx-coil
×1
elevator
×1
energypro
×1
equest
×1
fan
×1
hvac
×1
it-equipment
×1
lighting-control
×1
parking-garage
×1
performance-data
×1
schedule
×1
service-hot-water
×1
shading
×1
solar-collector
×1
variable-speed
×1
vrf
×1
Site design and logo: Copyright © 2015 Big Ladder Software LLC. All rights reserved.
The
Unmet Hours
and
Big Ladder
names and logos are trademarks of Big Ladder Software LLC.
User contributions licensed under the
Creative Commons Attribution Share Alike 3.0 License
.
Powered by
Please note: Unmet Hours requires javascript to work properly, please enable javascript in your browser,
here is how
dummy
×