First time here? Check out the
Help
page!
Question-and-Answer Resource for the Building Energy Modeling Community
Get started with the Help page
Hi there! Please sign in
help
tags
users
badges
ALL
UNANSWERED
Ask Your Question
RSS
Sort by »
date
activity ▼
answers
votes
53
questions
Tagged
appendix-g
×
leed
×
493
views
1
answer
8
votes
2023-04-06 04:37:02 -0500
Keigo
ASHRAE/IECC Baseline VAV Fan Curves and Min Flow Fraction
fan
ashrae-90.1
iecc
leed
appendix-g
102
views
1
answer
1
vote
2023-02-08 20:16:03 -0500
Keigo
Large Single Story Building HVAC Systems
hvac
ashrae-90.1
appendix-g
leed
76
views
no
answers
2
votes
2022-02-19 16:59:12 -0600
mattkoch
LEED System 4 Fan Selection
openstudio-application
leed
ashrae-90.1
appendix-g
night-cycle
214
views
2
answers
2
votes
2022-01-23 09:56:45 -0500
egillmor
high electricity use for chiller
openstudio-application
leed
appendix-g
ashrae-90.1
chiller
132
views
no
answers
1
vote
2021-02-19 20:47:17 -0500
Jacob
High airlfow and fan sizing eQuest, Build 7175
system-sizing
air-flow
leed
equest
appendix-g
171
views
no
answers
1
vote
2021-02-18 09:08:26 -0500
dradair
LEEDv4 non-predominate system selection residential
leed
appendix-g
residential
1k
views
1
answer
3
votes
2021-01-29 12:56:21 -0500
crduggin
What should the fuel source for the ASHRAE Baseline Model be when the proposed has a VRF System?
vrf
ashrae-90.1
appendix-g
leed
329
views
no
answers
1
vote
2021-01-28 06:32:03 -0600
Ag
LEED Summary Equyvalent Full Load Hour
energyplus
leed
appendix-g
summary-report
127
views
1
answer
2
votes
2020-03-24 07:04:46 -0500
JasonGlazer
LEED ENERGY MODEL, number of chillers
chiller
leed
appendix-g
128
views
1
answer
1
vote
2020-03-21 11:47:20 -0500
crduggin
Number of baseline Chillers - LEED v4
openstudio
appendix-g
chiller
leed
124
views
no
answers
2
votes
2019-12-16 09:36:55 -0600
ArturoReyes
Problem running baseline measure in openstudio when cooling tower present for LEED v3 model
appendix-g
cooling-tower
openstudio-measure
openstudio-standards
leed
145
views
1
answer
1
vote
2019-11-14 15:58:57 -0500
EnergyPlus question
Multi-Family Baseline Model
leed
appendix-g
ashrae-90.1
multi-family
371
views
2
answers
4
votes
2019-11-12 13:07:19 -0500
ashopinion
LEEDv4 Kitchens G3.1.1 Exception d
leed
appendix-g
ashrae-90.1
1k
views
1
answer
2
votes
2019-08-19 07:44:16 -0500
dradair
System types selected for the Appendix G System 7 baseline model. And if it is right to have assigned a reheat at the system level which makes assigns a reheat for the core zones automatically in the baseline model
appendix-g
leed
equest
414
views
1
answer
6
votes
2018-12-14 07:11:32 -0600
dradair
LEED Occupancy, design data vs ashrae
leed
appendix-g
86
views
no
answers
2
votes
2018-10-26 09:32:08 -0500
PJC
EnergyPro and ARI-rated conditions
energypro
leed
vrf
appendix-g
353
views
1
answer
4
votes
2018-06-12 11:33:40 -0500
willyJohan
Data Center Baseline System Questions
ashrae-90.1
leed
data-center
appendix-g
368
views
1
answer
3
votes
2018-06-01 10:11:14 -0600
MatthewSteen
Can I find variable pump with performance curve which can be used for LEED baseline case?
openstudio
pump
leed
ashrae-90.1
appendix-g
316
views
1
answer
2
votes
2018-05-10 03:00:50 -0500
Marco Furlani
Baseline G3.1.2.9: A term (pressure)
appendix-g
fan
leed
189
views
no
answers
3
votes
2018-04-11 13:07:18 -0600
JohannesBk
Air Traffic Control Tower process load
process-load
leed
appendix-g
it-equipment
124
views
no
answers
2
votes
2018-04-05 16:17:14 -0500
Gio
LEED Proposed: Mechanical equipment efficiencies
appendix-g
energyplus
leed
230
views
no
answers
2
votes
2018-04-04 09:06:18 -0500
Gio
Demand control ventilation: LEED
appendix-g
dcv
energyplus
leed
628
views
1
answer
6
votes
2018-03-22 09:10:00 -0500
dradair
LEED unconditioned zones
appendix-g
leed
energyplus
498
views
1
answer
3
votes
2018-03-20 09:15:08 -0600
dradair
LEED Baseline G3.1.2.1: EER and COP with fan energy
energyplus
performance-data
leed
appendix-g
503
views
1
answer
4
votes
2018-03-16 12:31:08 -0500
dradair
LEED Baseline Building: G3.1.2.9
energyplus
leed
appendix-g
design-air-flow-rate
vav
260
views
1
answer
2
votes
2017-10-19 12:06:50 -0500
ericringold
Realistic new construction Baseline
ashrae-90.1
appendix-g
leed
445
views
2
answers
5
votes
2017-08-01 16:14:28 -0500
Molly Curtz
Baseline System 8, Supply Air temperature
appendix-g
vav
leed
2k
views
1
answer
1
vote
2017-08-01 03:43:50 -0500
Julien Marrec
Baseline Shading System
leed
shading
appendix-g
521
views
1
answer
5
votes
2017-07-30 03:11:44 -0500
Julien Marrec
LEED Baseline System 8, how many VAV?
leed
appendix-g
hvac
air-loop
vav
3k
views
5
answers
7
votes
2017-04-07 14:56:24 -0500
CR Jones
regenerative elevators
elevator
leed
appendix-g
ashrae-90.1
1
2
next page »
Careers
Contributors
Tags
appendix-g
×30
leed
×30
ashrae-90.1
×11
energyplus
×6
chiller
×3
vav
×3
equest
×2
fan
×2
hvac
×2
openstudio
×2
openstudio-application
×2
vrf
×2
air-flow
×1
air-loop
×1
cooling-tower
×1
data-center
×1
dcv
×1
design-air-flow-rate
×1
elevator
×1
energypro
×1
iecc
×1
it-equipment
×1
multi-family
×1
night-cycle
×1
openstudio-measure
×1
openstudio-standards
×1
performance-data
×1
process-load
×1
pump
×1
residential
×1
shading
×1
summary-report
×1
system-sizing
×1
Site design and logo: Copyright © 2015 Big Ladder Software LLC. All rights reserved.
The
Unmet Hours
and
Big Ladder
names and logos are trademarks of Big Ladder Software LLC.
User contributions licensed under the
Creative Commons Attribution Share Alike 3.0 License
.
Powered by
Please note: Unmet Hours requires javascript to work properly, please enable javascript in your browser,
here is how
dummy
×