Create Baseline (90.10 2010) Measure gives error : OS 3.5.13.7.0
Create Baseline Measure fails to run and gives an error which states - "Required Availability Schedule not set, using always ON schedule'C:\fakepath\OS Error_Bool.PNG
This is image of the Bool error.
In reference with this post- https://unmethours.com/question/98987/swig-director-type-bool-mispatch-error-when-running-measures/?comment=99641#post-id-99641
I have added all the schedules spacetypes in place the measure tags and purged any other extra schedules. followed the video. I am not able to determine have been getting errors in OS 3.7.0 Version. The "Create Baseline" measure works fine in the cause of this error.older Openstudio.
Please advise!Not sure how to proceed.