I am modelling a multi-zone VAV for an educational building, which has 5 zones. Each zone has its own schedule, already assigned in the thermal template. However, when I model the VAV system, I cannot specify the corresponding schedule per each zone since it only allows for setting a single schedule for the AHU operation. How can I approximate my model under those conditions?