I am simulating a building with a GSHP and a gas boiler for heating, distrubuted by radiant flooring. The gas boiler only functions as extra in the winter times, this was cost related when te building was built. In OpenStudio the gas boiler runs at all time. Is there anyway I can give a heating system priority over the other in OpenStudio. Thanks in advance.