Water Service Modeling Help

Hello,

(sorry in advance for the English)

So I have the following scheme,

1) Boiler----Pump1-----Plate Heat Exchanger----Boiler 2) Plate Heat Exchanger-------Pump2------Water Tank--------Plate Heat Exchanger 3) Water Tank------3 way Valve-----Showers------Pump3------Water Tank

I am new in the modeling, can any one please guide me.

Do I have to create 3 water plant loop, and go from there?

I´m using Openstudio 1.7.5 and Energyplus 8.3

Thanks for the help

Water Service Modeling Help

Hello,

(sorry in advance for the English)

So I have the following scheme,

1) Boiler----Pump1-----Plate Heat Exchanger----Boiler 2) Plate Heat Exchanger-------Pump2------Water Tank--------Plate Heat Exchanger 3) Water Tank------3 way Valve-----Showers------Pump3------Water Tank

I am new in the modeling, can any one please guide me.

Do I have to create 3 water plant loop, and go from there?

I´m using Openstudio 1.7.5 and Energyplus 8.3

Thanks for the help

Water Service Modeling Help

Hello,

(sorry in advance for the English)

So I have the following scheme,

1) Boiler----Pump1-----Plate Heat Exchanger----Boiler 2) Plate Heat Exchanger-------Pump2------Water Tank--------Plate Heat Exchanger 3) Water Tank------3 way Valve-----Showers------Pump3------Water Tank

I am new in the modeling, can any one please guide me.

Do I have to create 3 water plant loop, and go from there?

I´m using Openstudio 1.7.5 and Energyplus 8.3

Thanks for the help

Water Service Modeling Help

Hello,

(sorry in advance for the English)

So I have the following scheme,

1) Boiler----Pump1-----Plate Heat Exchanger----Boiler 2) Plate Heat Exchanger-------Pump2------Water Tank--------Plate Heat Exchanger 3) Water Tank------3 way Valve-----Showers------Pump3------Water Tank

I am new in the modeling, can any one anyone please guide me.

Do I have to create 3 water plant loop, and go from there?

I´m using Openstudio 1.7.5 and Energyplus 8.3

Thanks for the help

image description

Water Service Modeling Help

Hello,

(sorry in advance for the English)

So I have the following scheme,

1) Boiler----Pump1-----Plate Heat Exchanger----Boiler 2) Plate Heat Exchanger-------Pump2------Water Tank--------Plate Heat Exchanger 3) Water Tank------3 way Valve-----Showers------Pump3------Water Tank

I am new in the modeling, can anyone please guide me.

Do I have to create 3 water plant loop, and go from there?

I´m using Openstudio 1.7.5 and Energyplus 8.3

Thanks for the help

image description

Hello,

First of all, thank you so much for the quick answer.

I just have to make the same question, because I have made a mistake in the drawing.

The water that leaves the Water Tank Storage (WTS), that is not used in shower does not return to the WTS, but actually pre-heat the fresh water that enter in the 3-way valve.

image description image description Do I have to change drastically the solution that was provide?

Thanks,

Water Service Modeling Help

Hello,

(sorry in advance for the English)

So I have the following scheme,

1) Boiler----Pump1-----Plate Heat Exchanger----Boiler 2) Plate Heat Exchanger-------Pump2------Water Tank--------Plate Heat Exchanger 3) Water Tank------3 way Valve-----Showers------Pump3------Water Tank

I am new in the modeling, can anyone please guide me.

Do I have to create 3 water plant loop, and go from there?

I´m using Openstudio 1.7.5 and Energyplus 8.3

Thanks for the help

image description

Hello,

First of all, thank you so much for the quick answer.

I just have to make the same question, because I have made a mistake in the drawing.

The water that leaves the Water Tank Storage (WTS), that is not used in shower does not return to the WTS, but actually pre-heat the fresh water that enter in the 3-way valve.

image description image description Do I have to change drastically the solution that was provide?

Thanks,