Hi, I'm using the Create DOE Prototype Building Measure's Hospital building type in Open Studio and running the Measure called: "Add a PSZ-HP to each zone" to swap out existing HVAC in the hospital to a packaged rooftop heatpump.
I'm getting the following severe error and wondering if anyone knows how to fix this, or if you have any recommendations of which other Measure for installing any type of heat pump would be better than the PSZ-HP measure:
Program Version,EnergyPlus, Version 9.4.0-998c4b761e, YMD=2021.07.23 10:42, * Severe * <root>[Coil:Cooling:Water][VAV_ER Clg Coil] - Missing required property 'air_inlet_node_name'. * Severe * <root>[Coil:Cooling:Water][VAV_ER Clg Coil] - Missing required property 'air_outlet_node_name'. * Severe * <root>[Coil:Heating:Water][ER_Exam3_Mult4_Flr_1 Water Htg Coil] - Missing required property 'air_inlet_node_name'. * Severe * <root>[Coil:Heating:Water][ER_Exam3_Mult4_Flr_1 Water Htg Coil] - Missing required property 'air_outlet_node_name'.
Thank you! * Fatal * Errors occurred on processing input file. Preceding condition(s) cause termination.