Hello,
I've searched High and Low for the reason that I can't get the basic baseline to run in PAT and so far have not found any answers. The question I have is also posted here without any answer because the user answered their own question even though it wasn't an answer just a clarification.
I want to just get my baseline model run and then add my alternatives, but I can't get the baseline to simulate. I get the server running and the analysis says it completed but there is no run time and the status is stuck at "queued". My seed file simulates in OpenStudio without issue and I ensured that in PAT I was pulling the OpenStudio Results measure from BCL rather than having a duplicate in My Measures directory.
Any help will be greatly appreciated.