Hi, in OpenStudio I have created my building with 3 zones, 1 of which has computers and elevators. To this zone I have assigned two different ElectricEquipmentLoads, one for the computers (15 W / mq) and one for the elevators (110000 W). I would like to assign two different schedules to these two loads. How can I do it?

Assign different schedules for different ElectricEquipmentLoads to the same zone

Hi, in OpenStudio I have created my building with 3 zones, 1 of which has computers and elevators. To this zone I have assigned two different ElectricEquipmentLoads, one for the computers (15 W / mq) and one for the elevators (110000 W). I would like to assign two different schedules to these two loads. How can I do it?it? image description image description image description

Assign different schedules for different ElectricEquipmentLoads to the same zone

Hi, in OpenStudio I have created my building with 3 zones, 1 of which has computers and elevators. To this zone I have assigned two different ElectricEquipmentLoads, one for the computers (15 W / mq) and one for the elevators (110000 W). I would like to assign two different schedules to these two loads. How can I do it? image description image description image description