Hi everyone,
I am modelling an industrial case that has only natural ventilation in the design building. I searched in LEED and ASHRAE for some guidance to do the baseline building when the proposed model has only natural ventilation, but i haven't found some clarifying answers. Can anyone help? What is expected to do in baseline buildings when the design building has only natural ventilation?