Question-and-Answer Resource for the Building Energy Modeling Community
Get started with the Help page
Ask Your Question

Revision history [back]

click to hide/show revision 1
initial version

how can I run a large number of Open Studio files in parallel

Hi everyone, I'm conducting a parametric energy use and thermal comfort study, I need to run around 700,000 cases.

I've used honeybee and Colibri to generate the Open studio files. now I need a way to run them with CPU parallel computing. although honeybee has a component that has parallel simulation capability, I get errors(error details) and cannot do the simulations. in addition, I prefer to do the runs without using rhinoceros.

Can anyone suggest me a solution or a tool to do to that(fixing honeybee errors or doing simulations outside the rhino environment)?

Thanks a lot.

how can I run a large number of Open Studio files in parallel

Hi everyone, I'm conducting a parametric energy use and thermal comfort study, I need to run around 700,000 cases.

I've used honeybee and Colibri to generate the Open studio files. now I need a way to run them with CPU parallel computing. although honeybee has a component that has parallel simulation capability, I get errors(error details) and cannot do the simulations. in addition, I prefer to do the runs without using rhinoceros.

Can anyone suggest me a solution or a tool to do to that(fixing honeybee errors or doing simulations outside the rhino environment)?

Thanks a lot.