Question-and-Answer Resource for the Building Energy Modeling Community
Get started with the Help page
Ask Your Question

Revision history [back]

click to hide/show revision 1
initial version

Some 90.1 schedules start HVAC after receptacle / lighting loads?

The ASHRAE Std. 90.1-2013 User's Manual contains schedules for various building types & functions. I noticed that a few of them follow a pattern where the lighting & receptacle loads ramp up an hour prior to the HVAC system operation. This seems a little bit odd because that would mean in some cases that space temperatures could start rising before the A/C is capable of controlling them.

Here's an example, for the Office building schedule:

image description

Are these schedules meant to represent actual typical building operation? Or were they constructed this way for some other reason?


Note that in the original Std. 90.1-1989 (the last year these schedules were included in 90.1 itself) the Office schedule was actually a little different and had the plug loads & HVAC schedules come on at the same time. This seems to further muddy the waters - why was a revision to this schedule made (at some point in time)?

image description

Thanks

Some 90.1 schedules start HVAC after receptacle / lighting loads?

The ASHRAE Std. 90.1-2013 User's Manual contains schedules for various building types & functions. I noticed that a few of them follow a pattern where the lighting & receptacle loads ramp up an hour prior to the HVAC system operation. This seems a little bit odd because that would mean in some cases that space temperatures could start rising before the A/C is capable of controlling them.

Here's an example, for the Office building schedule:

image description

Are these schedules meant to represent actual typical building operation? Or were they constructed this way for some other reason?


Note that

Furthermore, in the original Std. 90.1-1989 (the last year these schedules were included in 90.1 itself) the Office schedule was actually a little different and had the plug loads & HVAC schedules come on at the same time. This seems to further muddy the waters - why was a revision to this schedule made (at some point in time)?

image description

Thanks

Some 90.1 schedules start HVAC after receptacle / lighting loads?

The ASHRAE Std. 90.1-2013 User's Manual contains schedules for various building types & functions. I noticed that a few of them follow a pattern where the lighting & receptacle loads ramp up an hour prior to the HVAC system operation. This seems a little bit odd because that would mean in some cases that space temperatures could start rising before the A/C is capable of controlling them.

Here's an example, for the Office building schedule:

image description

Are these schedules meant to represent actual typical building operation? Or were they constructed this way for some other reason?

Furthermore, in the original Std. 90.1-1989 (the last year these schedules were included in 90.1 itself) the Office schedule was actually a little different and had the plug loads & HVAC schedules come on at the same time. This seems to further muddy the waters - why was a revision to this schedule made (at some point in time)?

image description

Thanks

Some 90.1 schedules start HVAC after receptacle / lighting loads?

The ASHRAE Std. 90.1-2013 User's Manual contains schedules for various building types & functions. I noticed that a few of them follow a pattern where the lighting & receptacle loads ramp up an hour prior to the HVAC system operation. This seems a little bit odd because that would mean in some cases that space temperatures could start rising before the A/C is capable of controlling them.

Here's an example, for the Office building schedule:

image description

Are these schedules meant to represent actual typical building operation? Or were they constructed this way for some other reason?

Furthermore, in the original Std. 90.1-1989 (the last year these schedules were included in 90.1 itself) the Office schedule was actually a little different and had the plug loads & HVAC schedules come on at the same time. This seems to further muddy the waters - why was a revision to this schedule made (at some point in time)?

image description

Thanks

Some Why do some 90.1 schedules start HVAC after equipment later than receptacle / lighting loads?

The ASHRAE Std. 90.1-2013 User's Manual contains schedules for various building types & functions. I noticed that a few of them follow a pattern where the lighting & receptacle loads ramp up an hour prior to the HVAC system operation. This seems a little bit odd because that would mean in some cases that space temperatures could start rising before the A/C is capable of controlling them.

Here's an example, for the Office building schedule:

image description

Are these schedules meant to represent actual typical building operation? Or were they constructed this way for some other reason?

Furthermore, in the original Std. 90.1-1989 (the last year these schedules were included in 90.1 itself) the Office schedule was actually a little different and had the plug loads & HVAC schedules come on at the same time. This seems to further muddy the waters - why was a revision to this schedule made (at some point in time)?

image description

Thanks

Why do some 90.1 schedules start HVAC equipment later than receptacle / lighting loads?

The ASHRAE Std. 90.1-2013 User's Manual contains schedules for various building types & functions. I noticed that a few of them follow a pattern where the lighting & receptacle loads ramp up an hour prior to the HVAC system operation. This seems a little bit odd because that would mean in some cases that space temperatures could start rising before the A/C is capable of controlling them.

Here's an example, for the Office building schedule:

image description

Are these schedules meant to represent actual typical building operation? Or were they constructed this way for some other reason?

Furthermore, in the original Std. 90.1-1989 (the last year these schedules were included in 90.1 itself) the Office schedule was actually a little different and had the plug loads & HVAC schedules come on at the same time. This seems to further muddy the waters - why was a revision to this schedule made (at some point in time)?

image description

Thanks