Question-and-Answer Resource for the Building Energy Modeling Community
Get started with the Help page
Ask Your Question

Revision history [back]

click to hide/show revision 1
initial version

Air Loop from OpenStudio to EnergyPlus

I have created an air loop for the outside air roof top unit. After running the simulation I have noticed that the IDF file has an "AvailabilityManager:Scheduled"; however the OS model did not have one. Also no matter what availability schedule I use for the fan in OS it will be overridden when translated to IDF file to match the Availibility manager schedule. I am not sure if I am missing something or the systems should be set this way.

image description image description

image description

image description

Air Loop from OpenStudio to EnergyPlus

I have created an air loop for the outside air roof top unit. After running the simulation I have noticed that the IDF file has an "AvailabilityManager:Scheduled"; however the OS model did not have one. Also no matter what availability schedule I use for the fan in OS it will be overridden when translated to IDF file to match the Availibility manager schedule. I am not sure if I am missing something or the systems should be set this way.

OS model image description image description

EP model image description

image description