I'm getting this fatal error in BEopt 2.8 and am not sure what it means:
Error: * Severe * GetZoneEquipmentData1: ZoneHVAC:EquipmentList = UNFINISHEDBASEMENT ZONE EQUIPMENT 5/28/2018 3:04 PM: 31.xml: Error: * ~~~ * ...multiple assignments for Zone Equipment Heating or No-Load Sequence=1, must be 1-1 correspondence between sequence assignments and number of equipments.
I get this error when I run either an ASHP or MSHP in a multi-unit (2) building, for either a finished or unfinished basement. I do not get it if I use a gas furnace, or if I I run an ASHP/MSHP in a single-family building.