How to change the Control Scheme Schedule on a PlantEquipmentOperationScheme ?
Using Openstudio (2.1.0) how can I change 'Always On Discrete' to a schedule of my choice?
I am confused because
$model.getPlantEquipmentOperationSchemes() calling model.getPlantEquipmentOperationSchemes() returns a ..:CoolingLoad object...
$model.getPlantEquipmentOperationSchemes()
OS:PlantEquipmentOperation:CoolingLoad,
{0f6d331e-560f-4bf3-b6b1-876bd6eae5d4}, !- Handle
North Building Cooling Tower Staging, !- Name
0, !- Load Range Lower Limit 1 {W}
934, !- Load Range Upper Limit 1 {W}
{0e4d7a85-4f39-4ceb-9e39-e03915c08726}, !- Range Equipment List Name 1
934, !- Load Range Lower Limit 2 {W}
1401, !- Load Range Upper Limit 2 {W}
{307111b7-eddd-4d1f-87df-9a6865a3457a}, !- Range Equipment List Name 2
1401, !- Load Range Lower Limit 3 {W}
4762, !- Load Range Upper Limit 3 {W}
{6b0a97b3-6a33-4685-976e-60e4cb773ebb}, !- Range Equipment List Name 3
4762, !- Load Range Lower Limit 4 {W}
1000000000, !- Load Range Upper Limit 4 {W}
{ca22b596-b1e2-4f60-b5b8-8b527101b7a0}; !- Range Equipment List Name 4
returns OS:PlantEquipmentOperation:CoolingLoad
objects.
I am expecting that call to return the object like this from the idf
idf
PlantEquipmentOperationSchemes,
North Chilled Water Loop Operation Schemes, !- Name
PlantEquipmentOperation:CoolingLoad, !- Control Scheme Object Type 1
Plant Equipment Operation Cooling Load 7, !- Control Scheme Name 1
Always On Discrete; !- Control Scheme Schedule Name 11
I'd like trying to set the control scheme schedule Control Scheme Schedule to control the operation of the chillers and pumps on the chilled water loop. loop.