How to change the Control Scheme Schedule on a PlantEquipmentOperationScheme ?

Using Openstudio (2.1.0) how can I change 'Always On Discrete' to a schedule of my choice?

I am confused because
$model.getPlantEquipmentOperationSchemes() returns OS:PlantEquipmentOperation:CoolingLoad objects.

I am expecting that call to return the object like this from the idf PlantEquipmentOperationSchemes, North Chilled Water Loop Operation Schemes, !- Name PlantEquipmentOperation:CoolingLoad, !- Control Scheme Object Type 1 Plant Equipment Operation Cooling Load 7, !- Control Scheme Name 1 Always On Discrete; !- Control Scheme Schedule Name 1

I'd like to set the control scheme schedule to control the chillers and pumps on the chilled water loop.

How to change the Control Scheme Schedule on a PlantEquipmentOperationScheme ?

Using Openstudio (2.1.0) how can I change 'Always On Discrete' to a schedule of my choice?

I am confused because
$model.getPlantEquipmentOperationSchemes()
calling model.getPlantEquipmentOperationSchemes() returns a ..:CoolingLoad object...

 $model.getPlantEquipmentOperationSchemes()
OS:PlantEquipmentOperation:CoolingLoad,
  {0f6d331e-560f-4bf3-b6b1-876bd6eae5d4}, !- Handle
  North Building Cooling Tower Staging,   !- Name
  0,                                      !- Load Range Lower Limit 1 {W}
  934,                                    !- Load Range Upper Limit 1 {W}
  {0e4d7a85-4f39-4ceb-9e39-e03915c08726}, !- Range Equipment List Name 1
  934,                                    !- Load Range Lower Limit 2 {W}
  1401,                                   !- Load Range Upper Limit 2 {W}
  {307111b7-eddd-4d1f-87df-9a6865a3457a}, !- Range Equipment List Name 2
  1401,                                   !- Load Range Lower Limit 3 {W}
  4762,                                   !- Load Range Upper Limit 3 {W}
  {6b0a97b3-6a33-4685-976e-60e4cb773ebb}, !- Range Equipment List Name 3
  4762,                                   !- Load Range Lower Limit 4 {W}
  1000000000,                             !- Load Range Upper Limit 4 {W}
  {ca22b596-b1e2-4f60-b5b8-8b527101b7a0}; !- Range Equipment List Name 4

returns OS:PlantEquipmentOperation:CoolingLoad objects.

I am expecting that call to return the object like this from the idf idf

 PlantEquipmentOperationSchemes,
   North Chilled Water Loop Operation Schemes, !- Name
   PlantEquipmentOperation:CoolingLoad,    !- Control Scheme Object Type 1
   Plant Equipment Operation Cooling Load 7, !- Control Scheme Name 1
   Always On Discrete;                     !- Control Scheme Schedule Name 1

1

I'd like trying to set the control scheme schedule Control Scheme Schedule to control the operation of the chillers and pumps on the chilled water loop. loop.

How to change the Control Scheme Schedule on a PlantEquipmentOperationScheme ?

Using Openstudio (2.1.0) how can I change 'Always On Discrete' to a schedule of my choice?

I am confused because calling model.getPlantEquipmentOperationSchemes() returns a ..:CoolingLoad object...

 $model.getPlantEquipmentOperationSchemes()
OS:PlantEquipmentOperation:CoolingLoad,
  {0f6d331e-560f-4bf3-b6b1-876bd6eae5d4}, !- Handle
  North Building Cooling Tower Staging,   !- Name
  0,                                      !- Load Range Lower Limit 1 {W}
  934,                                    !- Load Range Upper Limit 1 {W}
  {0e4d7a85-4f39-4ceb-9e39-e03915c08726}, !- Range Equipment List Name 1
  934,                                    !- Load Range Lower Limit 2 {W}
  1401,                                   !- Load Range Upper Limit 2 {W}
  {307111b7-eddd-4d1f-87df-9a6865a3457a}, !- Range Equipment List Name 2
  1401,                                   !- Load Range Lower Limit 3 {W}
  4762,                                   !- Load Range Upper Limit 3 {W}
  {6b0a97b3-6a33-4685-976e-60e4cb773ebb}, !- Range Equipment List Name 3
  4762,                                   !- Load Range Lower Limit 4 {W}
  1000000000,                             !- Load Range Upper Limit 4 {W}
  {ca22b596-b1e2-4f60-b5b8-8b527101b7a0}; !- Range Equipment List Name 4

returns OS:PlantEquipmentOperation:CoolingLoad objects.

I am expecting that call to return the object like this from the idf

   PlantEquipmentOperationSchemes,
          North Chilled Water Loop Operation Schemes, !- Name
          PlantEquipmentOperation:CoolingLoad,    !- Control Scheme Object Type 1
          Plant Equipment Operation Cooling Load 7, !- Control Scheme Name 1
          Always On Discrete;                     !- Control Scheme Schedule Name 1

I'd trying to set the Control Scheme Schedule to control the operation of the chillers and pumps on the chilled water loop.

How to change the Control Scheme Schedule on a PlantEquipmentOperationScheme ?

Using Openstudio (2.1.0) how can I change 'Always On Discrete' to a schedule of my choice?

I am confused because calling model.getPlantEquipmentOperationSchemes() model.getPlantEquipmentOperationSchemes() returns a ..:CoolingLoad object...list of OS:PlantEquipmentOperation:CoolingLoad objects.

 $model.getPlantEquipmentOperationSchemes()
OS:PlantEquipmentOperation:CoolingLoad,
 [OS:PlantEquipmentOperation:CoolingLoad,
  {0f6d331e-560f-4bf3-b6b1-876bd6eae5d4}, !- Handle
  North Building Cooling Tower Staging,   !- Name
  0,                                      !- Load Range Lower Limit 1 {W}
  934,                                    !- Load Range Upper Limit 1 {W}
  {0e4d7a85-4f39-4ceb-9e39-e03915c08726}, !- Range Equipment List Name 1
  934,                                    !- Load Range Lower Limit 2 {W}
  1401,                                   !- Load Range Upper Limit 2 {W}
  {307111b7-eddd-4d1f-87df-9a6865a3457a}, !- Range Equipment List Name 2
  1401,                                   !- Load Range Lower Limit 3 {W}
  4762,                                   !- Load Range Upper Limit 3 {W}
  {6b0a97b3-6a33-4685-976e-60e4cb773ebb}, !- Range Equipment List Name 3
  4762,                                   !- Load Range Lower Limit 4 {W}
  1000000000,                             !- Load Range Upper Limit 4 {W}
  {ca22b596-b1e2-4f60-b5b8-8b527101b7a0}; !- Range Equipment List Name 4
4 ]

returns OS:PlantEquipmentOperation:CoolingLoad objects.

I am expecting that call to return the object like this from the idf

   PlantEquipmentOperationSchemes,
          North Chilled Water Loop Operation Schemes, !- Name
          PlantEquipmentOperation:CoolingLoad,    !- Control Scheme Object Type 1
          Plant Equipment Operation Cooling Load 7, !- Control Scheme Name 1
          Always On Discrete;                     !- Control Scheme Schedule Name 1

I'd I'm trying to set the Control Scheme Schedule to control the operation of the chillers and pumps on the chilled water loop.

How to change the Control Scheme Schedule on a PlantEquipmentOperationScheme ?

Using Openstudio (2.1.0) how can I change 'Always On Discrete' to a schedule of my choice?

I am confused because calling model.getPlantEquipmentOperationSchemes() returns a list of OS:PlantEquipmentOperation:CoolingLoad objects.

$model.getPlantEquipmentOperationSchemes()
 [OS:PlantEquipmentOperation:CoolingLoad,
  {0f6d331e-560f-4bf3-b6b1-876bd6eae5d4}, !- Handle
  North Building Cooling Tower Staging,   !- Name
  0,                                      !- Load Range Lower Limit 1 {W}
  934,                                    !- Load Range Upper Limit 1 {W}
  {0e4d7a85-4f39-4ceb-9e39-e03915c08726}, !- Range Equipment List Name 1
  934,                                    !- Load Range Lower Limit 2 {W}
  1401,                                   !- Load Range Upper Limit 2 {W}
  {307111b7-eddd-4d1f-87df-9a6865a3457a}, !- Range Equipment List Name 2
  1401,                                   !- Load Range Lower Limit 3 {W}
  4762,                                   !- Load Range Upper Limit 3 {W}
  {6b0a97b3-6a33-4685-976e-60e4cb773ebb}, !- Range Equipment List Name 3
  4762,                                   !- Load Range Lower Limit 4 {W}
  1000000000,                             !- Load Range Upper Limit 4 {W}
  {ca22b596-b1e2-4f60-b5b8-8b527101b7a0}; !- Range Equipment List Name 4 ]

I am expecting that call to return the object like this from the idf

   PlantEquipmentOperationSchemes,
          North Chilled Water Loop Operation Schemes, !- Name
          PlantEquipmentOperation:CoolingLoad,    !- Control Scheme Object Type 1
          Plant Equipment Operation Cooling Load 7, !- Control Scheme Name 1
          Always On Discrete;                     !- Control Scheme Schedule Name 1

I'm trying to set the Control Scheme Schedule to control the operation of the chillers and pumps on the chilled water loop.