Hi.
1_ In facility label, If I assign the construction set and schedule set at the building story, are this settings automatically assigned on all the spaces? Or Should I assign the sets per each space?
2_in the same label, with sorting building by thermal zone: to turning on the ideal air load, do I have to put a check mark for each thermal zone? Is there a faster way ?
thanks A.