Hourly Data From CBECC-Com

Hi All,

I have a technical question regarding viewing the hourly data from Title 24 simulation from CBECC-Com (essentially E+).

After the simulation, I opened HourlyResults.csv file to view the hourly data. It is basically showing only couple days in a year, I have cooling/heating/lighting/equipment energy use. Except those days, the hourly data are all just "0". This is a little bit odd to me. I assume it has something to do with the internal load schedule because it is not only for HVAC but also happens to lighting and equipment. But, isn't Title 24 use default schedule for all the internal gains (even if I don't assign any schedule to the space, it will still use the default)?

Have any of you ever ran into this problem before? Please advice if there is something I should check.

Thanks!