Hey all;
Has anyone had to complete a GSHP model for T24 Performance compliance with CBECCcom? I do know that WSHPs are a zone system option, but I am not seeing a means to set up a GSHP within CBECCcom.
If not possible within CBECCcom, I assume / it might be possible to 'fake' a WSHP model to get it to create the Baseline model, then configure the GSHP in EnergyPlus. Thoughts?
Thanks in advance for everyone's help/thought/inputs. DA