In EMS/ERL, does Holiday == 3.0 always correspond to the design days?

Going a bit farther, the EMS/ERL documentation lists

Holiday 0 if not. 1.0, 2.0, etc., for each type of holiday in model

but I do not know where to go/if there is a place to go to see what each of the non-zero values means. Do they have a set meaning in EnergyPlus, or is the meaning model specific?

In EMS/ERL, does Holiday == 3.0 always correspond to the design days?

Going a bit farther, the EMS/ERL documentation lists

Holiday 0 if not. 1.0, 2.0, etc., for each type of holiday in model

but I do not know where to go/if there is a place to go to see what each of the non-zero values means. Do they have a set meaning in EnergyPlus, or is the meaning model specific?specific? Also, are both design days (summer and winter) assigned to Holiday == 3.0?