Hey, I have a schedlue-file for internal gains (Watt). I tried:
OtherEquipment,
InternalGain, !- Name
8FF727, !- Zone or ZoneList Name
InternalGain, !- Schedule Name
EquipmentLevel, !- Design Level Calculation Method
, !- Design Level {W}
, !- Power per Zone Floor Area {W/m2}
, !- Power per Person {W/Person}
0, !- Fraction Latent
1, !- Fraction Radiant
0; !- Fraction Lost
does not work. Do I have to enter a design level (max. of my schedule) and %of this as schedule?