Infrastructure for air conditioning was delivered to the finished building, but the equipment was not [closed]

asked 2024-04-15 08:22:22 -0600

updated 2024-04-16 09:17:22 -0600

I'm conducting a simulation for LEED. In the original design, they are delivering the piping to accommodate the air conditioning system, such as receiving evaporators (not delivered), for example. However, no condenser or evaporator is being delivered when the building is constructed. Should I consider the air conditioning system in the proposed model or only in the baseline? Because I understand that if it's not modeled in the proposed case, there would be a significant difference in energy consumption. Thanks in advance, everyone!

edit retag flag offensive reopen merge delete

Closed for the following reason duplicate question by Aaron Boranian
close date 2024-04-16 09:16:48.521416

Comments

Duplicate of this post.

Aaron Boranian's avatar Aaron Boranian  ( 2024-04-16 09:16:57 -0600 )edit