PAT output to 1 minute or download idf?

asked 2023-02-28 15:00:00 -0600

aipi's avatar

updated 2023-03-01 09:43:28 -0600

I want to run a batch of the DOE reference buildings with different measures/schedules but I want minute-level data. I know I can get this with plain E+ modding the IDF but it'd be so much easier to let the OSM measures in PAT do the work of modifying schedules, etc. Can I download the IDFs once they're modified by PAT or how to I make a reporting measure that returns minute-scale data?

edit retag flag offensive close merge delete