Question-and-Answer Resource for the Building Energy Modeling Community
Get started with the Help page
Ask Your Question
1

Is it possible to set a schedule for material properties (SHGC, U-Value, Solar transmittance, conductivity) in Energyplus??

asked 2022-11-28 23:25:27 -0500

updated 2022-11-29 09:29:55 -0500

Is it possible to set a schedule for material properties (SHGC, U-Value, Solar transmittance, conductivity) in Energyplus??

edit retag flag offensive close merge delete

1 Answer

Sort by ยป oldest newest most voted
1

answered 2022-11-29 19:17:45 -0500

If you create the full set of constructions in the IDF that you want to vary across, you can use the Surface Construction State EMS actuator to swap a surface's construction from one to another on a timestep basis.

Be sure to read the full documentation, as it includes statements such as "Using the surface construction state actuator brings with it a high degree of risk when it comes to modeling thermal heat capacity and transient heat transfer in opaque surfaces. If this actuator is used inappropriately, for example to assign different constructions, to a single surface, that have radically different heat storage capacities, then the heat transfer modeling results may not be physically accurate."

edit flag offensive delete link more

Your Answer

Please start posting anonymously - your entry will be published after you log in or create a new account.

Add Answer

Careers

Question Tools

1 follower

Stats

Asked: 2022-11-28 23:25:27 -0500

Seen: 213 times

Last updated: Nov 29 '22