schedules in designbuilder

asked 2021-10-20 06:03:30 -0600

afshin.mombeini gravatar image

updated 2021-10-20 09:51:45 -0600

what designdays (summer and winter) means in designbuilder schedules? which days? and why when i change the load fraction for designdays my simulation results will change? because in designbuilder help it was mention that schedules for designdays only have an effect on izing not simulation tab results.

edit retag flag offensive close merge delete

1 Answer

Sort by ยป oldest newest most voted
2

answered 2021-10-21 04:44:12 -0600

Filipe Sousa gravatar image

Increasing the load on the design day will have an impact on the system sizing. One would expect to see the simulation results change if the system capacities are significantly different and perhaps undersized.
You can verify the systems capacities by comparing the .eio files from both runs.

Regarding the design days used for Winter and Summer, these are specified in DesignBuilder at Site level > Location tab.

edit flag offensive delete link more

Your Answer

Please start posting anonymously - your entry will be published after you log in or create a new account.

Add Answer

 

Question Tools

1 follower

Stats

Asked: 2021-10-20 06:03:30 -0600

Seen: 191 times

Last updated: Oct 21