Do you know if its possible to have a measure running in PAT have its input data change based on the optimization scenarios PAT generates? Essentially I have PAT creating different scenarios that modify the capacity of various distributed energy resource type measures but I also need the costs of those measures to be adjusted to match the change in capacity size and be factored into the PAT optimization analysis.