ventilation control

asked 2020-03-12 23:56:57 -0500

yingli.lou@colorado.edu's avatar

updated 2020-03-13 14:58:53 -0500

In the EnergyPlus model, the operation of ventilation is controlled by the HVAC operation schedule, which is zero-one control. Does that mean the ventilation is zero when the HVAC operation schedule is zero?

edit retag flag offensive close merge delete