AEDGOffice VAV, CHW measure with electric reheat or chiller efficiency measures
OPenStudio/PAT:2.6
I'm writing this with reference to the following measure from BCL: AedgOfficeHvacVavChW UID: 28e4e4fb-a10a-4f85-82f9-c4ad2dd3cf12 Version ID: 014075d4-2d6c-4f5f-b65c-ca37d3a5e9c3
As is, the current measure destroys all the plant loops and adds a chilled water system along with a hydronic heating system. Is there a measure that does the same, but either keeps the existing heating system, or one that would create an electrical system with the former preferred. We are comparing results with other measures and it looks weird when this measure runs and is the only one to produce natural gas. If either measure does exist in the BCL, please let me know.
Best, Ricardo