Creating ASHRAE baseline building
Hello everyone,
I was using the 'Create Baseline Building' measure from BCL for one of the projects I am working with. The measure was applied successfully with a bunch of warning messages. I was even able to run the simulation successfully. My understanding of this measure was that it will replace all the proposed inputs with 90.1 2010 inputs. I do see that in the HTML report, but don't see that in the individual tabs. How do I know if the measure is applied correctly?
Also, the measure says 90.1 2010 BETA. Is this still under testing?
One of the warning messages that I had on the file was- ''WARN Could not determine the standards fenestration frame type for Sub Surface 1 from U 0.72 SHGC 0.25 Sgl Ref-B-M Tint 6mm. This surface will not have the standard applied.''- Does that mean the fenestration hasn't been switched?