Air Loop from OpenStudio to EnergyPlus

asked 6 years ago

Saif's avatar

updated 6 years ago

I have created an air loop for the outside air roof top unit. After running the simulation I have noticed that the IDF file has an "AvailabilityManager:Scheduled"; however the OS model did not have one. Also no matter what availability schedule I use for the fan in OS it will be overridden when translated to IDF file to match the Availibility manager schedule. I am not sure if I am missing something or the systems should be set this way.

OS model image description image description

EP model image description

image description

Preview: (hide)