What is priority order for construction set to be applied in OpenStudio?
I prepared two construction set for Office part and Podium part and tried to apply them based on the floor as shown below image.
However, when I investigate idf file exported from OpenStudio, I find many BuildingSurface:Detailed
which has different construction I specified.
I didn't set any Default Construction Set
in Space Type
,Space
,Facility:Building
.
Does anyone have any idea what is defining the construction?
Also, what is the priority order if Default Construction Set
is specified by multiple aspect (e.g. Space Type
,Space
,Facility:Building
)