Demand control ventilation: LEED

asked 2018-04-04 09:06:18 -0600

Gio's avatar

Hi, I'm modelling a DCV for leed credits (90.1 2007).

The design has insufficient outdoor air to mantain the CO2 setpoint levels. Can I model it without worrying about it?

Should I just model the same outdoor air for both models (the baseline zone requires DCV according to 6.4.3.9)?